Four operational pillars, one accountable partner
We break down our consultancy into four distinct operational pillars that take your project from a technical specification to a certified, running production line.
Equipment Sourcing & OEM Selection (China–Africa)
Selecting the wrong factory is the single most common reason African equipment projects fail. We eliminate that risk with a structured vetting process for every sourcing project.
- Technical vetting of manufacturers against your process requirements
- Price / specification comparison across three vetted OEMs
- Factory background checks, certifications and reference projects
- CAD / electrical drawing review before any commitment
Pre-Shipment Quality Control & Inspection
We verify the equipment on the factory floor in China — before the container ships and before final payment. This is where your capital is protected.
- Verifying motor specifications — voltage and frequency (Hz) matching your site
- Confirming stainless steel grades and material certifications
- Component counts and full bill-of-materials verification
- Factory testing under load prior to export
Cross-Border Logistics & Customs Compliance
Importing industrial equipment into the CEMAC zone involves certification, freight and regulatory steps that can stall a project for months. We navigate them for you.
- Managing SGS / COTECNA pre-shipment inspection certifications
- Freight forwarding coordination — sea, port and overland to site
- CEMAC import procedures and documentation preparation
- Cargo insurance and claim handling expertise
On-Site Installation, Commissioning & Operator Training
Delivery isn't complete when the equipment arrives — it's complete when the line runs at full capacity with a trained local team operating it.
- Managing site preparation — electrical and civil works
- Supervising local assembly and installation works
- Testing equipment and certifying the line for daily production
- Training local staff to operate and maintain the equipment
Example project
How a full engagement comes together
Turnkey Poultry Production Unit — 5,000 birds/day
1 · Feasibility
Power, water and land audited; budget validated against a 5,000 birds/day capacity target.
2 · Sourcing
Three vetted Chinese OEMs compared on A-type cage lines, tunnel ventilation and feed mill specs.
3 · Inspection
On-site factory audit: motor voltage/Hz verified, stainless grades confirmed, load testing passed.
4 · Delivery
Sea freight coordinated, SGS certification cleared, CEMAC customs processed, installation supervised.
Need equipment sourced, inspected and installed?
Submit your project requirements and our engineering team will build your technical roadmap.